The university wanted a bridge for its students over a busy roadway that would appear intriguing from afar. Instead it collapsed before it was even finished. We look into how design errors, poor peer review and denial led to a collapse that claimed six peoples lives.With John Chidgey.This show is Podcasting 2.0 Enhanced
Report into the Incidents:
NTSB Final Report (PDF)
Design Criteria and Bid:
FIU Pedestrian Bridge Design Criteria Rev 0 (PDF)
FIU Pedestrian Bridge Design Criteria Rev 1 (PDF)
MCM / FIGG Proposal (PDF)
Civil Structural References:
Truss
Truss Bridges
Steel Bridge Design
What is Post-tensioning?
Prestressed, Pretensioned and Post-Tensioned Concrete
Engineer of Record Definition
Non-Destructive Concrete Evaluation & testing
Companies Involved:
Louis Berger is now part of WSP
WSP Global
FIGG Engineering
FIGG Bridge Engineers
Links of Potential Interest:
Florida bridge collapse has some hard lessons
Florida International University pedestrian bridge collapse
University-City Prosperity Project
Meet the prominent Miami firm behind the collapsed FIU bridge
Miami Bridge Failure Part 3: The Peer Review
FHWA proposes 10-year debarment for FIGG Bridge Engineers
Louis Berger only firm refusing to settle FIU bridge collapse
Bankrupt construction company that built FIU bridge reaches deal to pay victims $42M
Lessons learnt 3 years since Florida tragedy
FHWA proposes 10-year debarment for FIGG Bridge Engineers
Judge Rejects FIGG’s Motion to Halt 10-Year Debarment
Riverside Expressway:
Glimmer of hope?
Riverside Expressway
Support Causality on PatreonEpisode Gold Producers:
'r' and Steven Bridle.Episode Silver Producers:
Mitch Biegler, John Whitlow, Shane O'Neill, Kevin Koch, Oliver Steele, Lesley Law Chan, Hafthor and Bill.